Vessel with Nigeria LNG reaches Turkey on Feb. 26

- With a capacity of 126,004 tons, vessel was built in 2018

Malta-flagged LNG carrier Castillo De Caldelas, which originated from Nigeria's Bonny port, arrived in Turkey on Feb. 26, according to ship tracking data on Tuesday.

With a capacity of 126,004 tons, the vessel, which was built in 2018, left Nigeria on Feb. 5 and reached its final destination - the Aliaga LNG terminal on Tuesday at 08.00 local time.

Turkey's Aliaga LNG terminal is located in the city of Izmir.

By Murat Temizer

Anadolu Agency

energy@aa.com.tr