Nigerian LNG carrier, LNG Bonny II, reached Turkey on Monday, April 12, according to ship tracking data.
With a capacity of 170,000 cubic meters, the vessel left the Nigerian port of Bonny on March 29 and arrived at its final destination - the Marmara Ereglisi LNG Terminal in Turkey.
The ship sails under the Bermuda flag.
By Murat Temizer
Anadolu Agency
energy@aa.com.tr